How to teach literacy in primary school Chinese

"Teaching is for not teaching", the famous saying of Mr. Ye Shengtao, has long been widely read. To achieve the goal of "not teaching", what to "teach" is a core issue.

It is only the most basic task of literacy teaching to complete the amount of literacy specified in each year. In a person’s long study life, there will always be unfamiliar words. What should I do at this time? Therefore, the textbook arrangement should not simply aim at the result of learning-knowing Chinese characters, but should pay more attention to "teaching people to fish" while "teaching people to fish".

The following are some "passwords" for improving students’ autonomous literacy, which are suggested by the unified textbooks. They are also the key points for teachers to use textbooks for teaching, but they must be kept away:

Password 1: Pinyin and Illustration

Pinyin is an important tool for students’ autonomous literacy in the initial stage when their literacy is insufficient.

Unified primary school Chinese textbooks accurately locate the learning function of pinyin, emphasize the tool value of pinyin, arrange Chinese pinyin in the first volume of grade one, arrange the learning content with the rule of pinyin learning as the main clue, and solve the problems in a short time. After that, teachers can lead students through after-class exercises and the column of "Use of Words and Expressions" in the Chinese Garden, and constantly review and consolidate them in the follow-up textbooks.

In order to enable students to master Pinyin firmly, from the first volume of the first grade to the first volume of the second grade, except for some special texts, all the textbooks adopt the method of full-text phonetic notation, while the aid system adopts the method of phonetic notation for difficult words to guide students to understand Chinese characters with Pinyin.

Illustration is also an important resource for students’ autonomous literacy. "Reading with the help of pictures in reading materials" is an important task in the teaching of low-level reading. Texts in the lower years of primary school Chinese textbooks are generally accompanied by vivid illustrations, and teachers can develop students’ reading ability and guide them to read independently through illustrations.

Teachers can make full use of a brand-new text form created by the textbook from the first volume of grade one-comic book text. The pictures and words in the text are closely matched, and there are two or three sentences under each picture, which is similar to common comic books. The text is no longer full-text phonetic notation, but only a few difficult words are phonetic notation. "Difficult words" refer to new words that are not required to be read and words that are required to be read but students cannot guess.

For example, in the lesson "Little Snail", students can’t guess the words "live, children", so they still help students to read by means of phonetic notation.

Comic book texts are no different from other full-text phonetic texts in terms of learning requirements: they are also responsible for reading and writing, reading the text, understanding the content of the text, and accumulating words and phrases. However, because it is only difficult to pronounce words, it increases the difficulty of learning, and students must rely on other clues to guess and read new words.

Through the study of comic books, students feel that they can learn to read independently with or without pinyin. There are many ways to learn to read independently, which lays the foundation for the development of students’ autonomous literacy ability in the future.

Password 2: the law of word formation of Chinese characters

In the face of unfamiliar words, the less external force a person uses, the stronger his literacy ability. For example, without consulting others, using pinyin, using context and life experience, and using reference books, we can guess the general meaning of the word only by its own word-formation characteristics, which should be the core and key ability of autonomous literacy. The law of word formation of Chinese characters is the basis of this ability. The more fully and deeply students know the law of word formation of Chinese characters, the stronger their ability of independent literacy.

The unified primary school Chinese textbooks pay special attention to the teaching of the knowledge of Chinese character formation rules, and teachers should emphasize this point in teaching. For example, the arrangement of literacy classes attaches importance to word literacy. For example, the first volume of grade one, Sun Moon Fire and Water, uses pictographs to read, and Sun Moon Ming uses knowing words to read; The second volume of grade one, Little Green Frog, Word Puzzle, Song of Animals and Children, On the Operating Field, and the first volume of grade two, Song of Trees, use pictophonetic characters to guide students to discover the word-formation rules of pictographic, knowing and pictophonetic Chinese characters, understand the organic relationship between their sounds, shapes and meanings, and feel the charm of Chinese characters.

In addition to the arrangement of literacy classes, we can constantly strengthen the rules of word formation of Chinese characters through the column "My Discovery", so that students’ understanding of Chinese characters can be improved from perceptual to rational, and a systematic understanding of the rules of word formation of Chinese characters can be formed.

On the basis of building students’ understanding of the rules of Chinese character formation, they can cooperate with the teaching materials and begin to actively guide students to read independently. For example, the exercise design of the second volume of the second grade "Chinese Garden 7".

It can be found that the textbooks deliberately present words that students don’t know, and guide students to mobilize their knowledge reserves and think about how to guess and read these unknown words. With the help of the word-formation rules of pictophonetic characters, students know that the meanings expressed by these words should be related to sound through the common radicals-the words beside the mouth, and the right half of these words are all words that students have learned, so they are likely to prompt the pronunciation of these words as phonetic radicals. According to this clue, students can guess not only the meaning but also the pronunciation of new words. Combined with sentences, they can also guess the specific context in which these words are used.

Another example is the arrangement of "Literacy Gas Station" in the second volume of "Chinese Garden Five" in grade two.

It is also an unknown word. In the above question, students can still judge the meaning of new words with the help of the law of word formation by the form and meaning.

In this way, in the face of unfamiliar characters, students can boldly guess and read with the help of basic knowledge of the rules of Chinese character formation. With the deepening of students’ understanding of the rules of Chinese character formation, their ability to read independently will be stronger. The sense of accomplishment brought by the successful experience in learning will further arouse their enthusiasm for literacy and enable them to read independently more actively.

Password 3: Context and Life

When it is difficult to guess the meaning of a word by its word-formation characteristics, it is also an important method to put the word or word in context or use life experience to understand it.

Lv Shuxiang, a famous linguist, believes that words should be embedded in the context to have life, easy to remember and know usage. Context provides many clues to understand this word and word. Teachers should attach importance to the use of teaching materials and guide students to understand the meaning of new words and words by using context. For example, Unit 3 of the second volume of Grade One and Unit 4 of the first volume of Grade Two take "understanding the meaning of words in context" as the language element of the unit, and let students learn this important method through the demonstration and guidance of their learning partners. For example, The Tree and the Magpie, the next volume of the first grade, requires students to understand the meaning of "loneliness" through the first paragraph of the text; The first volume of the second grade "Grape Valley" guides students to contact the above to understand the meaning of "colorful"; "Dayu Harnessing Water" guides students to guess the meaning of "flooding" by referring to statements such as "Flooding the fields and destroying the houses". Wait a minute.

In addition, we should also pay attention to guiding students to guess the meaning of words or words by using life experience. For example, the word "steep" in the first volume of the second grade "Huangshan Strange Stone" simply means that "the mountain slope is very large, straight up and down", which is difficult for the second grade students to understand. But if we start with students’ life experience, let them think about the mountains they have climbed, and arouse the images and emotional experiences related to steepness in students’ minds, students can have an epiphany and guess the general meaning of this new word.

In addition to the guidance of the text, teachers can also strengthen the awareness of understanding the meaning of words in connection with the context and life experience from the after-class exercises and the column "Use of Words and Expressions" in the Chinese garden, and guide students to use this method to guess and read new words and words continuously.

For example, the exercise design of the first volume of the second grade "Chinese Garden IV":

Using the rules of word formation of Chinese characters and guessing the meaning of words and words by using the context and life experience broadens the ways of students’ autonomous literacy, and students’ autonomous literacy ability can be further developed.

Password 4: reference book

Dictionaries are the most basic reference books for students. The unified Chinese textbooks for primary schools attach great importance to the use of reference books, and set up dictionary-looking columns in Chinese Garden III, the second volume of Grade One, and Chinese Garden II, the first volume of Grade Two, respectively, to guide students to learn to use word order search and radical search to find unknown words. The textbook not only introduces the search essentials of these two methods in detail, but also closely combines learning with application, guiding students to use dictionary search to find unfamiliar words and solve problems encountered in reading.

In order to make students skillfully use reference books, the textbook arranges consolidation exercises in dictionary lookup from many angles. For example, the dictionary practice of "who is the fastest" in the second volume of Chinese Garden V in Grade One aims to improve the speed of students looking up new words in the dictionary with phonetic order; The first volume of the second grade cultivates students’ consciousness of "when encountering unfamiliar words, guess first, and then check the dictionary for verification". For example, the exercise design of the lesson "Dayu Water Control".

In order to improve students’ ability to find new words by radical search, the textbook also carries out special exercises for some new words that are difficult to find.

For example, the first volume of the second grade "Chinese Garden 7" is about the search practice of independent characters.

Find out the following words by radical search and fill them in again.

Dictionaries are silent teachers. When students have the ability to look up dictionaries, literacy can enter a more autonomous and independent state, which is a leap in students’ autonomous literacy. At this point, the first volume of grade two arranges the text "Paper Boat and Kite" and "Wind Doll" without phonetic notation, guiding students to guess and read new words by using the methods they have learned comprehensively. For example, the exercise design of the lesson "Paper Boat and Kite".

Students can still guess and read the new words and words with "kite, squirrel, catch, wish you happiness, willingness and crying" by means of illustrations, context, existing life experience and the rules of word formation of pictophonetic characters. Different from the first grade, some new words that can’t be guessed with the help of existing knowledge and experience, such as the word "cry", can be recognized by students by looking up the dictionary. In other words, from this stage on, students have mastered a comprehensive method of autonomous literacy and formed a certain ability of autonomous literacy.

(The author of this article is JUNG WOO, senior editor of the primary school Chinese editing room of People’s Education Publishing House.) 

High-quality development projects in Dafeng District focus on "welcome inspection"

  The surge of spring tide urges people to advance, and sails with the east wind. On April 8th, the Yancheng High-quality Development Project Observation Promotion Meeting was held in Dafeng District. The participants’ footprints spanned the main battlefield of the Yangtze River Delta Integrated Industrial Development Base and concentrated on "reviewing" the latest achievements of high-quality project construction in Dafeng District.

  From Dafeng Economic Development Zone, an important part of "the core of intellectual creation", to a high-tech zone that shines with intelligence and is "in full bloom", and then to a port that thrives on the sea and develops green. Everywhere we go, we are full of vitality, and a picture of green transformation comes into view. The industrial clusters with distinctive characteristics have risen strongly, which has become a vivid footnote for Dafeng to "be the vanguard of the integrated development of the Yangtze River Delta", which makes people touch and feel the strong pulse and surging trend of high-quality development in Dafeng District.

  Grasping projects means grasping development, and seeking projects means seeking the future. In recent years, Dafeng District has firmly grasped the core of industry and unswervingly promoted chain development. The annual invoicing sales of three strategic emerging industries, new energy and equipment manufacturing, new energy auto parts and new generation electronic information, exceeded 40 billion yuan. Honeycomb energy lithium-ion power battery and Bomin electronic high-density interconnection printed circuit board are listed as major projects in this year’s province.

  Yancheng Bomin High Density Interconnected Printed Circuit Board Project

  Jiangsu Bomin Electronics Co., Ltd., as the head enterprise of electronic information industry in Dafeng District, has aimed at the forefront of the industry in recent years, accelerated the "change from intelligence to digital" and continuously enhanced the innovation momentum, and built the first provincial-level intelligent manufacturing demonstration factory in Dafeng District.

  Walking into the high-density interconnection PCB project workshop of this enterprise, sophisticated equipment and testing facilities such as cutting-edge press, vacuum etching line, fully automatic LDI exposure machine and fully automatic optical circuit inspection are dazzling, and the charm of "smart factory" is self-evident. At present, the project is in trial production. When it is fully completed and put into production, it is estimated that the annual invoice sales will be 3 billion yuan and the tax revenue will be 200 million yuan.

  "Our high-end products can replace imports. Among them, Anylayer HDI boards focus on 5G new markets, big data, artificial intelligence, industrial Internet and other fields. IC carrier boards and Micro LED fill the gaps in domestic products, which will drive the downstream enterprises of integrated circuits to develop together and break the monopoly of foreign enterprises." Sheng Li, the general manager of the company, called several treasures.

  Jiangsu jinweier machinery co., ltd 

  The manufacture of high-end products is inseparable from high-end technology and production equipment. As a customized intelligent equipment manufacturing head enterprise, Jiangsu Jinwei Machinery Co., Ltd. persists in technological innovation and continuously increases independent research and development investment. Through cooperation with universities such as Tsinghua and Southeast University, it has successfully developed more than 60 kinds of extrusion equipment for plates, sheets and films required in various application fields. In the workshop of the enterprise’s high-end intelligent equipment manufacturing project, a series of EVA photovoltaic cell packaging hot melt adhesive film production lines attracted the attention of the participants.

  "EVA packaging film is mainly used for packaging crystalline silicon and some thin-film solar cell modules. Because of its advantages in adhesion, durability and optical characteristics, EVA packaging film is more and more widely used in current modules and various optical products." The person in charge of the enterprise said that the company’s EVA photovoltaic film production line technology is internationally leading, and the current global market share is as high as 70%-80%.

  Yancheng honeycomb energy lithium-ion power battery

  The honeycomb energy power battery project with a total investment of 10 billion yuan is one of the first major projects in the province this year, and it is also the first major project to land in Yancheng Yangtze River Delta integrated industrial development base. "High level of intelligent manufacturing, strong ability of independent innovation and wide market application" is the general evaluation given by the participants after observing the enterprise.

  It is understood that Honeycomb Energy has achieved mass production of cobalt-free batteries with a series of subversive innovative technologies such as high-speed lamination and cobalt-free batteries, and has become more than 30 high-end customers such as Great Wall Motor strategic suppliers. At present, the project has entered the trial production stage. After it is completed and put into production, it will realize the annual sales of 12 billion yuan and tax revenue of 500 million yuan, and become an important core industrial base of blade batteries in the Yangtze River Delta region.

  Hongshun silicon-based semiconductor technology co., ltd

  "The production technology of high-purity quartz sand with high temperature resistance of 1800℃, 99.998% and above has long been monopolized by foreign enterprises such as the United States and Norway, and the production process is extremely complicated. At present, we have this completely independent intellectual property right and hold the corresponding patent, which has solved the problem of silicon rod production ‘ Get stuck in the neck ’ Difficult problem. " Listening to the introduction of the person in charge of Hongshun Silicon-based Semiconductor Technology Co., Ltd., the participants couldn’t help but praise it.

  It is understood that the Hongshun silicon-based semiconductor material project is not only internationally advanced in process technology, but also extremely high in adsorption value. Through this enterprise, it has continuously built a strong chain to supplement the chain and attract more well-known silicon materials enterprises at home and abroad to invest in Fengfeng. In the near future, an influential domestic silicon material industry production base will rise from here.

  Trina Solar 10GW Photovoltaic Module Project

  It took only 120 days from breaking ground in March last year to mass production at the end of June. Trina Solar’s 10GW photovoltaic module project set a new speed in the industry, which was started, completed and mass produced that year. Stepping into Trina Solar’s spotless project workshop, with 20 automatic production lines running at full capacity, 210 ultra-high power components with the most advanced technology in the industry quickly rolled off the assembly line.

  Wu Jianfeng, the person in charge of Trina Solar Yancheng, used four key words: "construction speed benchmark, process technology benchmark, cost control benchmark and intelligent management benchmark" to intensively express the industry leading and super competitiveness of the project to the participants. It is understood that the whole process of the project is automatic and intelligent, and AI technology is introduced into inspection and testing to improve the abnormal detection rate and reduce the intensity of work; The actual output of a single line exceeds 500MW/ line, and the average output value per mu exceeds 30 million yuan, ranking first in the industry. It can realize annual invoicing sales of 13.7 billion yuan and tax revenue of 250 million yuan.

  Yueda Automobile (Dafeng) Kechuangyuan

  Yueda Automobile (Dafeng) Science and Technology Park is an important supporting project of Yancheng automobile industry chain, covering an area of 122 mu, with a total investment of about 500 million yuan. Focusing on the functional orientation of "scientific and technological innovation, industrial incubation and scientific and technological service", it is committed to building a comprehensive scientific and technological innovation park of automobile industry, which integrates R&D design, testing, project incubation and demonstration application.

  At present, it has settled in 4 intelligent networked enterprises, 2 new energy automobile enterprises, 6 testing and testing companies and 3 service organizations. After visiting the Smart Car Innovation Center, Science and Technology Incubation Center, Intelligent Networked Test Site, Yangtze River Delta (Yancheng) Intelligent Networked Automobile Testing Technology Innovation Alliance and other sites, the participants highly appreciated the project’s practice of relying on the unique geographical and industrial foundation of the port area, giving full play to the unique advantages and industry resources of the China Automobile Test Site, making every effort to build an intelligent networked demonstration highland and building the ecology of the whole automobile industry chain.

  Rural revitalization is the "ballast stone" to achieve high-quality development.

  Demonstration Project of Rural Revitalization in Xinzhong Village, Xituan Town

  The demonstration project of rural revitalization in Xinzhong Village of Xituan Town is a vivid epitome of the comprehensive implementation of rural revitalization demonstration towns and villages in Dafeng District. As the first batch of rural revitalization demonstration villages in the whole region, Xinzhongcun adheres to the mode of "small incision, replicability and mass participation", focusing on the comprehensive improvement of the rural environment with all elements of "Tianshui Road Forest Village", promoting the rebirth of old houses with small investment, creating a new look with small courtyards, and retaining homesickness memories with small nodes.

  When driving into Xinzhong Village Farm Belt, the villagers spontaneously donated old bricks, tiles, window frames and other old objects, and created node sketches through combination decoration, presenting exquisite art at a small cost, telling the past years and awakening homesickness memories. The Green Field Xinzhong Agricultural Park is full of vitality, with smart greenhouses, new farmers’ homes, fat horse shops, picking gardens, Xinzhong Station and other formats, and it is open to welcome guests.

  This is not only a beautiful countryside, but also a grass-roots park. The "1+18" business entities gather here, attracting social capital investment of 200 million yuan, and building a benefit linkage mechanism of "government building, farmers singing opera and farmers increasing income". The fruits and vegetables in the park are sold to the Yangtze River Delta region for more than 200 million yuan every year. Participants walked, watched and discussed all the way, and spoke highly of the project’s efforts to build a rural complex with village and garden characteristics, with social capital investment as the main force, high-standard farmland construction as the starting point and the upgrading of old villages as the focus. They thought that this "new-middle experience" with small investment, replicability and popularization was worth learning.

  The Yellow Sea coast is in spring tide, and the project construction is competing in Qian Fan. Dafeng District will focus on the integration of salt abundance, provinces and the Yangtze River Delta, highlight the two key words of "integration" and "high quality", give full play to the strength of the whole region, collect the wisdom of the whole region, and promote the integrated industrial development base of the Yangtze River Delta to "show its image in one year, make great changes in three years, and achieve results in five years", and strive to turn its characteristic advantages into high-quality development momentum, and sing the "Dafeng Song" of being the pioneer of high-quality development in coastal areas.

  (Source: Editor of Dafeng District Rong Media Center/Su Yue)

Global Connection | A Chinese enterprise project has brought great changes to this poor village in Brazil.

  Xinhua News Agency, Dinia, Maria, Brazil, November 21st (Reporter Zhao Yan, Chen Weihua) In the northern Brazilian state of Tocantins, there is a small village named Maria Dinia, which was settled by slaves who escaped from slavery (Kirombo people). Now the villagers are all descendants of the "runaway slaves". Similar villages are usually located in dense forests or wilderness with inconvenient transportation, and people live in poverty.

  However, since last year, with the official operation of a fruit processing factory, the life of women in Maria Dinia village has changed greatly. Malena, a villager, recently sat on a new sofa at home and told Xinhua News Agency about the change of his life.

  "Life changes before and after work can be described from white water to red wine." Malena said, "I used to be a housewife, but I have a job since last year. Now, I have bought a sofa and a refrigerator with the money I earned, and I can buy a mobile phone without installment. The exterior wall of my house has also begun to be painted with cement. It can be said that my dreams have come true one by one. I also connected to the Internet at home, and I learned to contact business, purchase and sell online. " Malena kept talking while showing the reporter around his home.

  On October 4th, 2022, in Dinia, Maria, Tocantins, Brazil, Malena, a worker of a fruit processing factory, used a newly bought computer at home. Xinhua News Agency reporter Wang Tiancong photo

  The fruit processing factory where Malena works was sponsored by State Grid Brazil Holding Company of China, which belongs to a project of the company’s basic environmental protection plan. At present, there are 10 workers, 9 of whom are women.

  Anne De Amorim, coordinator of State Grid’s environmental, social and corporate governance, told reporters that during the construction of the second phase of the power transmission and transformation project of Meilishan Hydropower Station, Brazil’s second largest hydropower station, because the transmission line passed near the village, the builders talked with the villagers and learned that there were a large number of fruit trees in the area, and the villagers wanted to build a fruit processing factory, but the local water quality was not good. Therefore, State Grid Batong decided to help the village drill two wells, which can not only provide high-quality water, but also build a fruit processing factory.

  De Amorim said: "After hard work, we got the environmental protection permission to build the factory and incorporated it into the company’s basic environmental protection plan. We hope that through this project, the village can achieve sustainable development. "

  On October 4, 2022, in Maria Dinia, Tocantins, Brazil, workers picked fruits. Xinhua News Agency reporter Wang Tiancong photo

  In November 2018, State Grid Batong helped the village to complete the construction of the factory building. Since 2019, villagers have been trained from picking fruits to using machines. At the beginning of 2021, the factory obtained a business license and officially put into operation in August of the same year. The pulp produced by the factory comes from acerola cherry, mango, pineapple, passion fruit and other local fruits.

  Graciela Paludo, a food engineer, is an expert contracted by State Grid Pakistan Control to teach local villagers how to make fruit pulp. She trained villagers in fresh fruit preservation, fruit processing, standardized packaging and shelf life control, and also helped them contact buyers.

  "Although the road here is not easy and it will take a long time, it is all worth it." Paludo said, "Because I see that they are no longer dependent on their husbands and can support their families through labor. They are women, blacks, Keelung people, far away from the city, and almost forgotten by society, but now they have become the pillars of their families. I am proud of them."

  On October 4, 2022, in Dinia, Maria, Tocantins, Brazil, food engineer Graciela Paludo (right) worked with workers. Xinhua News Agency reporter Wang Tiancong photo

  The fruit processing factory produces "Keelung Orchard" brand fruit pulp. Brazil’s national supply company has signed a contract with the factory to make this brand of fruit pulp available for primary school students in public schools to drink during meals. In addition, the factory also signed contracts with some hotels and private institutions for supply. The average annual income of workers in fruit processing plants can reach 8,000 reais (about 11,000 yuan).

  Due to the large temperature difference between day and night in the wooded grassland where Maria Dinia village is located, it is beneficial to sugar storage, and the fruit pulp tastes good, and the product market will open soon. When the order is large, it is necessary to buy fruits in the nearby market to supplement it. Therefore, Malena wants to plant some more fruit trees in his own land.

  "I only thank China enterprises! We hope that the scale of the factory will become larger and larger, and the products will be sold farther and farther. I believe that as long as there is a desire, it will be realized through hard work. " Malena said. (Clip: Wang Yujue; Editor: Yang Aihua, He Mengshu, Jia Xiaohua, Shang Jing, Qian Yong Wen)

  Produced by Xinhua News Agency International Department

  Produced by Xinhua News Agency’s International Communication Integration Platform

Focus interview: thriving for the New Year

Cctv news(Focus Interview): The sun and the moon open Singapore dollars, and heaven and earth spring again. During the Spring Festival in the Year of the Loong, the land of China is permeated with a strong festive atmosphere and vigorous economic vitality. The data of Spring Festival travel rush in 2024 is remarkable. From the first day of the first lunar month to the eighth day of the first lunar month, the cross-regional mobility of the whole society reached 2.311 billion person-times. Some people were visiting relatives and friends, while others were traveling. In particular, the popularity of dragon culture has added a fire to the consumption of cultural tourism in various places. Tourist attractions come up with various designs and activities containing dragon elements to stimulate the new heat of the national tide. Merchants have also made full use of the charm of traditional culture, and used various the Year of the Loong ideas to attract citizens and tourists to spend their cards.

Speaking of this year’s Spring Festival, what impressed people the most? Focus on a red fire. Night markets, business districts and scenic spots are full of two words: popularity. During the Spring Festival, people who have worked hard for a year rush back to their hometowns from all directions to reunite with their loved ones. This is the reunion year that everyone has been waiting for for for a long time.

In the twelfth lunar month, the time to get home enters the countdown. This bus full of migrant workers in Guang ‘an, Sichuan, traveled more than 1,200 kilometers from Fuyang, Anhui, and sent people full of homesickness back to their relatives. The homesickness that has been brewing for a year is finally released at this moment when I see my family. 

New Year’s Eve, bright red "happiness"The word is full of festive joy. In Daliuzhuang Village, Wuyi County, Hebei Province, the home of 83-year-old Guo Shunyi is particularly lively. Five families and 15 people from four generations live together for the New Year, which is the most important day of the year for this big family.

This year’s Spring Festival, in order to celebrate the long-awaited reunion, relatives and friends gather together, and the small family will become everyone, and the small table will also become a big table. In order to let everyone have a good reunion year and have a good reunion dinner, in addition to restaurant meals, many catering companies have launched personalized catering services such as home delivery of dishes and home cooking of reunion dinners by chefs. In some places, home cooking has become a trend.

If you want to go back to your hometown for reunion and visit relatives and friends, you have to go out for a walk if you want to have a rich holiday life. Different from the Spring Festival holiday in previous years, this year, the new holiday mode of "returning home+traveling" has become the choice of many people.

How to play during these eight-day holidays?

In the Spring Festival Evening, the scene of the poem title that once exploded in the audience was reappeared by tourists in the Datang city that never sleeps in Xi ‘an.

This year’s Spring Festival, the tourism market is extremely hot, and all localities have tried their best to attract tourists.

You see, ordinary people have spoken for their hometowns and sent sincere invitations to tourists all over the country.

YOLO’s tourism market, with people’s participation and choice, is experiencing recovery and transformation.

During the Spring Festival holiday, the ice and snow craze inspired by the Winter Olympics continues. For southern tourists, it has become a new fashion to spend the New Year and welcome the New Year in the snow and ice. During the Spring Festival, the ice and snow resorts in the north welcomed an average of more than 1.1 million tourists from the south every day. Harbin has continued its previous tourist enthusiasm, welcoming more than 7.55 million tourists six days before the Spring Festival. This Spring Festival, "Erbin"Not only their own fire, but also with other" old iron "in Northeast China. On the tourism platform, the bookings of Spring Festival hotels in Suihua, Heilongjiang, Fushun, Liaoning, Shenyang, Jilin, Siping and Heihe, Heilongjiang all increased by more than 10 times compared with last year.

Compared with 2019, the flow of people traveling in the Spring Festival in 2024 increased by 45%, and the continuous enrichment of consumption supply also provided people with more fresh tourism prospects.

This year’s Spring Festival, it is fashionable to accompany the national treasure panda for the New Year. The number of hotel bookings around Chengdu Giant Panda Breeding Base has increased by nearly 10 times compared with the same period of last year.

Chinese New Year can also be spent at sea. During the Spring Festival, nearly 4,600 tourists boarded domestic cruise ships to see the world, which made them more proud of their novelty. Some people also choose to experience a different taste of the year on a special train that runs through the north and south of the river.

This Spring Festival, on social platforms, there were more than 3.3 million searches about "New Ways of Chinese New Year".

This year’s Spring Festival, more and more people choose to stay away from the hustle and bustle of big cities and experience a different flavor of the New Year full of local characteristics. The number of holiday hotel bookings in many third-and fourth-tier cities has increased significantly, becoming the dark horse of this year’s Spring Festival tourist destination. 

This Spring Festival holiday, cultural elements have activated the new enthusiasm of cultural tourism in many ancient cities. This year is the Year of the Loong, and when walking through the streets, people are dazzled by all kinds of "dragon"element.

When a horse-faced skirt with a unique oriental charm meets the Year of the Loong, what inspiration will it collide with? How to make the traditional folk New Year Lantern Festivaldragon"Does the element lead the national tide?

With the Year of the Loong’s grand debut, all localities used their brains and made great efforts to write the Year of the Loong’s articles to create a dragon-flavored Spring Festival for everyone.

In Inner Mongolia, the ice dragon boat race is a drum race, which makes the Year of the Loong very lively at the beginning of the year.

Some people appreciate the dragon culture in the noisy atmosphere of gongs and drums, and some people feel the dragon in the quiet museum. "Blue and white red dragon porcelain plate" and "gold-plated copper wishful dragon saddle" have been possessed in Qinghai Provincial Museum at different times.dragon"The exhibition of elemental cultural relics has greatly amazed tourists.

During the Spring Festival holiday, the public spent it in the nourishment of dragon culture. The Year of the Loong said the dragon, in the streets, lanterns and temple fairs, many designers and businessmen also put the dragon, a traditional cultural element with unique China characteristics, into modern life through new designs and new expressions. Dragon costumes, dragon pendants and dragon toys … … Colorful, creative and uniquedragon"Elements not only brought consumption boom, but also led a wave of cultural boom.

The creation of the dragon theme has made traditional culture a real hit, and non-legacy and traditional folk customs have also merged with the trend culture, rendering the atmosphere of the New Year with new scenes and new ways of playing, leading the national hot flashes.

In the old town of Huangyan, Taizhou, Zhejiang Province, a team of designers carried out design transformation on the basis of traditional non-legacy lanterns, and thousands of Song-style palace lanterns turned the old town of Wudongqiao with a thousand-year history into a punching trend place during the Spring Festival. 

During the Spring Festival in the Year of the Loong, the National Centre for the Performing Arts (NCPA) made the audience immersed in the "beauty of national quintessence" through brand-new creative cultural activities such as Beijing Opera Flash, Beijing Opera Oil Painting Exhibition and Digital Beijing Opera. Most of the protagonists in the classic drama "Dragon and Phoenix Becoming Lucky" staged here are from the theater’s "90"after"Bear, the younger expression in the play not only attracted a large number of young audiences, but also made the traditional culture of China glow again.

During the Spring Festival holiday, the whole country is filled with jubilant and prosperous holiday atmosphere. From the first day of the first lunar month to the eighth day of the first lunar month, the total box office of movies exceeded 8 billion yuan, setting a box office record for the Spring Festival in China film history; During the eight days of the Spring Festival holiday, there were 474 million domestic tourists, a year-on-year increase of 34.3%; Since the 23 rd of the twelfth lunar month, the total passenger flow of key business districts in China has increased by over 70% year-on-year; Around the Spring Festival, the content of more than 5 million punch cards in traditional culture set off a craze on social platforms.

Zou Yinyan, deputy director and associate researcher of the Macroeconomic Research Office of the Economic Forecasting Department of the National Information Center, said: "The consumption during the Spring Festival this year can be summed up in two words, one is hot and the other is new. The popularity is reflected in the obvious increase in the mobility of people across regions in the whole society during the Spring Festival this year. After the whole society moved, it promoted the vitality of the consumer market. Innovation in the field of consumption is a very prominent new growth point. This kind of innovation is not only manifested in the innovation of traditional commodity consumption, but also in the innovation of service consumption mode, which plays a very good role in stimulating consumption willingness and promoting the release of potential in the consumer market. "   

During the Spring Festival in the Year of the Loong, the popularity of cultural tourism consumption in various places not only witnessed the popularity of traditional culture in China, but also showed cultural self-confidence, boosted the consumer market, and also reflected people’s strong demand for reunion, leisure and cultural experience. When the traditional culture is integrated into the trend culture in new ways, new scenes and new ways of playing, it not only makes the traditional culture more modern and fashionable, but also gives the Spring Festival consumption deeper cultural significance and emotional value. As an important node to stimulate domestic demand and activate consumption potential, the consumption fever of the Spring Festival holiday has made a good start for the whole year, which also shows that stimulating consumption requires not only traditional consumption hotspots, but also continuous innovation and creativity.

E-sports attracted attention on the stage of Hangzhou Asian Games —— How to cultivate e-sports talents in colleges and universities?

  On October 2nd, the Knife Tower Final of Hangzhou Asian Games ended in Hangzhou E-sports Center, and the China team let one chase two beat the Mongolian team to win the championship. At this point, the e-sports events of the Hangzhou Asian Games have all ended, and the China team won 4 gold medals and 1 bronze medal, making it the biggest winner of the e-sports events of the Hangzhou Asian Games.

  In recent years, the scale of e-sports events has been expanding. On September 6th, the International Olympic Committee announced the establishment of an e-sports committee, which highlighted the IOC’s recognition of the development potential of e-sports.

  With the continuous development of e-sports industry, the cultivation of e-sports talents has become a social concern. In 2016, the Ministry of Education announced 13 supplementary majors for higher vocational enrollment, including "e-sports and management". Since then, e-sports education has officially entered the classroom, and many colleges and universities have set up related majors.

  However, in terms of teachers, courses and public opinion, the current e-sports education in colleges and universities is facing no small challenge. What are the characteristics of talent demand in e-sports industry? How to cultivate e-sports talents in colleges and universities? The reporter interviewed this.

  There is a great demand for talents in e-sports industry.

  China E-sports Industry Report 2022 shows that in 2022, the revenue of China’s e-sports industry was 144.503 billion yuan, and 108 domestic e-sports events were held throughout the year.

  In contrast to the vigorous development of the industry, there is a big talent gap in the e-sports industry at present. According to the report released by the Ministry of Human Resources and Social Security at the beginning of this year, less than 15% of the jobs in the e-sports industry are in a state of manpower saturation, while the gap in the middle and upper reaches of similar industries such as event production and broadcasting is 1.5 million.

  "At present, the problem of talent shortage in e-sports industry is serious." According to Xu Jian, a professor at the School of Media and Communication, Shanghai Jiaotong University, at present, there is a shortage of reserve professional players in e-sports talents in China, and there is a shortage of professionals in operation and management. Xu Jian believes that this is related to the fact that the whole society has not really regarded e-sports as a professional sport. "Compared with other sports athletes, the problems of the entrance and exit of e-sports players have not been well solved. In addition, the public has different understanding of e-sports, which also affects the attractiveness of related occupations to people."

  "People often equate e-sports with games, which is a misunderstanding. Some games can be used as carriers for e-sports, but not all games can develop into e-sports. " Yan Hongqiao, deputy dean of the School of Sports Media and Information Technology of Shandong Institute of Physical Education, said that as a sport, e-sports has many characteristics similar to other traditional sports, such as playing under certain rules and having a high degree of intellectual or physical antagonism.

  In this Asian Games, the results of e-sports events will be recorded in the national medal list, which belongs to the "intellectual project" with chess events.

  Yan Hongqiao said that virtual reality and simulated sports have increasingly developed into an important part of the sports field. "From the definition of e-sports by the International Olympic Committee, virtual sports are also within the concept of e-sports."

  E-sports education in colleges and universities needs to break through the bottleneck

  In 2019, Shandong Institute of Physical Education enrolled the first batch of undergraduate students majoring in e-sports, which is also the first university in China to offer undergraduate majors in e-sports. Today, four years later, the first batch of e-sports graduates officially entered the society.

  Yan Hongqiao introduced that among the first batch of students majoring in e-sports in Shandong Institute of Physical Education, half of them entered the e-sports industry after graduation, except some students who went on to further their studies.

  In China, the start of e-sports education in colleges and universities is inseparable from the rapid development of e-sports industry. In 2016, "e-sports and management" became one of the new majors, and subsequently, many colleges and universities opened e-sports majors one after another.

  However, the development of e-sports major is not smooth. According to the reporter’s statistics, at present, among the schools offering e-sports and management majors, there are 5 schools at the undergraduate level and 165 schools at the specialist level, and some of them have stopped enrolling students.

  "There is a phenomenon of rushing headlong into the e-sports major at the junior college level, and there is also a lack of employment orientation in the training process. The courses are miscellaneous but not refined, and the students’ practical ability is weak. At the same time, the shortcomings of teachers are prominent and the teaching staff is generally weak." Yan Hongqiao said that e-sports professional education in colleges and universities is still in its infancy in China.

  Xu Jian believes that some e-sports majors are set up in cities where e-sports industry is not so developed, and there is no good interaction with the industry. There are generally problems such as single content and insufficient system in curriculum setting.

  Training compound e-sports talents into a new direction

  "At present, the training of e-sports talents carried out by clubs and other subjects is indeed more effective and more adaptable to the development of the industry." Despite this, Xu Jian still believes that it is of great value to develop e-sports talents in colleges and universities.

  "As a new type of sports, e-sports has interdisciplinary characteristics since its birth. The e-sports industry has formed a highly relevant industrial chain and needs all kinds of compound talents. " In Xu Jian’s view, this is the great advantage of developing e-sports talents in colleges and universities. For example, he said that professional e-sports commentator positions need talents who know both communication and e-sports. "Therefore, the e-sports major must not be covered by a single discipline. Colleges and universities can organize teachers from different disciplines such as sports, news communication and computer to jointly create courses and cultivate comprehensive and applied talents that are more in line with the needs of the industry."

  In Shandong Institute of Physical Education, the school complements each other’s shortcomings by introducing enterprise teachers and order-based training, forming a joint force for e-sports talent training.

  Zhang Xueteng, a 2023 graduate of Shandong Institute of Physical Education majoring in e-sports, joined a well-known e-sports company this year. He said that through the cooperation between schools and enterprises, he has gained more practical opportunities and improved his employment competitiveness.

  During the interview, the person in charge of an industry company said that through industry research, it is conservatively estimated that there are more than 100 types of jobs related to e-sports and there are abundant employment opportunities. "We will also pass ‘ Electricity-based plan ’ And other initiatives, more actively carry out in-depth cooperation with universities and educational institutions, and jointly cultivate more professional talents in the direction of e-sports operation and club operation management. " The person in charge said.

Commission for Discipline Inspection of the Central Committee of the Communist Party of China: Standardize and clarify party member’s working procedures such as restoring party member’s rights after t

CCTV News:The website of the State Supervision Commission of the Central Commission for Discipline Inspection published the Notice of the Commission for Discipline Inspection of the CPC Central Committee on Standardizing and Defining the Working Procedures of Restoring party member’s Rights after the expiration of the probation and punishment of party member. The full text is as follows:

Discipline inspection commissions of all provinces, autonomous regions and municipalities directly under the Central Government, the accredited institutions and agencies of the Central Commission for Discipline Inspection, the Disciplinary Committee of the Military Commission, and the discipline inspection institutions of enterprises and universities in charge of management:

  In order to standardize and clarify the working procedures of party member’s probation and recovery of party member’s rights after the expiration of punishment, according to the provisions of Articles 21 and 22 of the Provisions on the Approval Authority and Procedures for Disciplinary Actions of party member in the Communist Party of China (CPC) (hereinafter referred to as the "Regulations"), relevant issues are hereby notified as follows.

  I. Procedures for resuming party member’s rights after the probation period expires. After the expiration of party member’s probation period, the party branch where he works should make a careful investigation on his actual performance during the probation period. If it is considered that he meets the conditions for restoring party member’s rights after investigation, he should make a "Publicity on the Rights of Comrade party member (who was punished by probation in party member)" and publicize it in his unit and party branch (including the unit where he was punished). The publicity period is generally not less than 5 days; After the expiration of the publicity period, if there is no objection or the objection is not established after verification, general party membership meeting, a party branch, shall be convened to discuss the restoration of his rights in party member. I shall not be absent from the meeting without justifiable reasons, and truthfully report his ideological understanding, work performance, law-abiding, honesty and self-discipline and future plans during the probation period. When voting in general party membership meeting, I should generally withdraw. After general party membership meeting, the Party branch, discussed and formed a resolution, he should report the general party membership meeting resolution and other materials to the local grassroots party Committee; After deliberation, the grass-roots Party committee agrees to restore its party member rights on schedule, and it shall report to the Party committee (party group) at the next lower level of the Party organization that made the decision on disciplinary action for deliberation. The Party Committee (Party Group) at the next lower level of the Party organization that originally made the decision on disciplinary action, after soliciting the opinions of the discipline inspection organ with the authority of supervision and discipline, considered that it met the conditions for restoring party member’s rights, made the Decision on Restoring party member’s Rights to Comrade * * * (who was punished by staying in the Party for observation).And according to the cadre personnel management authority and organizational relationship, it is included in my file and copied to the party organization that originally made the decision on disciplinary action; That it does not meet the conditions for the restoration of party member’s rights, it shall be handled in accordance with the second and third paragraphs of Article 21 of the Regulations; However, if the disciplinary inspection organ with the authority to supervise and discipline clearly informs party member, who has been punished by staying in the Party for observation, that the clues about the suspected violation of discipline have not been ascertained, the party committee (party group) shall suspend the deliberation and shall not make a decision first, and the disciplinary inspection organ with the authority to supervise and discipline shall ascertain the situation and notify the party committee (party group) within 6 months from the date of feedback. Party member, who has been punished by probation for one year, intends to make a decision to extend the probation period for one year according to the procedures after the expiration of probation, which shall be handled with reference to the above procedures.

  Two, on the issue of party member’s written application for the restoration of party member’s rights. After the expiration of party member’s probation, party member’s rights will be restored, and the party branch where he works will start the procedures ex officio within one month after the expiration of probation. After deliberation by the grass-roots party committee, it will be reported to the party committee (party group) at the next lower level of the party organization that made the disciplinary decision. Among them, if party member, who was punished by probation, submits a written application to his party branch to restore party member’s rights after the expiration of probation, the party branch shall start the procedures within 5 days after receiving the written application. The party organization that originally made the decision on disciplinary action and its following party organizations shall not determine that party member, who was punished by probation, did not show repentance during his probation; However, if party member, who was punished by staying in the Party for probation, took the initiative to report his thoughts, work and correct his mistakes, and voluntarily submitted the above-mentioned written application, the party branch where he worked can serve as an important reference for whether he meets the conditions for restoring party member’s rights.

  Third, there is no subordinate relationship between the party organization that made the decision to stay on probation and the party branch where party member is subject to probation. In accordance with the "Regulations", if the corresponding party organization makes a decision to stay in the party for probation, after the probation period expires, with reference to the second paragraph of Article 44 of the Regulations, the grassroots disciplinary committee established by the grass-roots party committee where the punished person is related shall, in accordance with the conditions listed in the first and second paragraphs of Article 21 of the Regulations, form a resolution through discussion by the local party branch general party membership meeting, and make a decision to restore his party member rights or extend the probation period for one year after being submitted to the grass-roots party committee for deliberation and consent. After examination, the disciplinary inspection organ with the authority to supervise and discipline believes that it should be expelled from the party in accordance with the provisions of the third paragraph of Article 21 of the Regulations, and must also perform the approval procedures in accordance with the provisions of the second paragraph of Article 14 of the Regulations. The disciplinary Committee at or above the county level and other corresponding party organizations that approved the expulsion from the party made a decision to expel the party, and copied to the party organization that originally made the decision on disciplinary action.

  Discipline inspection organs at all levels should accurately grasp and implement the requirements of this notice, and assist Party committees at the same level to urge Party organizations at all levels within their jurisdiction to make a decision to restore party member’s rights, extend the probation period for one year or expel party member from the Party in strict accordance with their authority, procedures and prescribed conditions. For the problems encountered in the implementation, it is necessary to report to the Central Commission for Discipline Inspection in a timely manner step by step (to the case trial room).

  CPC Central Commission for Discipline Inspection

  June 19, 2023

China Bank was granted the invention patent: "A method and device for setting transfer limit"

According to the news of Securities Star, China Bank (601988) has obtained a new invention patent authorization according to the data of Tianyancha APP. The patent name is "A Method and Device for Setting Transfer Limit", the patent application number is CN202110545162.3, and the authorization date is April 22, 2025.

Patent Abstract: The invention discloses a method and a device for setting transfer limit, which comprises the following steps: obtaining historical data of a plurality of target influencing factors from account information of different users as training samples, training the limit analysis model for the purpose that the output result of the training sample by the limit analysis model approaches the standard transfer limit, and analyzing the transfer limit of users through the pre-trained limit analysis model according to the current data of a plurality of target influencing factors of users. Therefore, the pre-trained limit analysis model can analyze the transfer limit that conforms to the user’s actual situation, and update the user’s transfer limit according to the relationship between the predicted user’s second transfer limit and the preset safety limit, further ensuring the user’s financial security.

Since the beginning of this year, 119 new patents have been granted to banks in China, a decrease of 84.26% compared with the same period last year.

Source: Tianyancha APP

The above contents are compiled according to the public information of Securities Star, which is generated by intelligent algorithm (No.310104345710301240019), and do not constitute investment advice.

Beijing Economic and Technological Development Zone 2022 Public Recruitment Announcement for Education Institutions

  According to the spirit of the document "Implementation Measures for Open Recruitment of Staff in Public Institutions in Beijing" (No.102 [2010] of the Beijing People’s Society), and in combination with the employment needs in the education field of Beijing Economic and Technological Development Zone, we are now openly recruiting staff in public institutions for fresh graduates from universities at home and abroad. The relevant matters are announced as follows.

  I. Recruitment positions

  This open recruitment involves two institutions, namely, Beijing No.2 Middle School Economic Development Zone School and Yizhuang New City School attached to the National People’s Congress. It is planned to recruit 78 staff members. There are 21 posts in the Economic Development Zone of Beijing No.2 Middle School, and it is planned to recruit 30 people, all of whom are specialized technical posts; Yizhuang New City School, a middle school affiliated to the National People’s Congress, plans to set up 29 posts and recruit 48 people, all of whom are specialized technical posts. See the attachment for specific recruitment positions.

  Second, the recruitment target

  This recruitment target is the 2022 fresh graduates of ordinary colleges and universities who are included in the national unified enrollment plan (excluding commissioned students and orientation students) and have obtained corresponding academic qualifications and degree certificates, unemployed graduates who have left school within two years, and returned overseas students who have obtained degrees from institutions outside China and completed the academic degree certification of domestic education departments during the period from August 1, 2021 to July 31, 2022.

  Third, the recruitment conditions

  (a) support the leadership of the Communist Party of China (CPC), abide by the Constitution and laws, and have good political quality and moral conduct.

  (two) physical and mental health, love education, abide by teachers’ professional ethics, abide by work discipline, and have the physical conditions and psychological quality to perform their duties normally.

  (3) Non-Beijing graduates in 2022 and unemployed graduates who left school within two years should meet the conditions for introducing non-Beijing graduates in Beijing; Overseas students with non-Beijing permanent residence in universities outside China should meet the requirements for talent introduction and settlement in Beijing.

  (4) Age calculation method: if the post age is required to be 35 years old or below, that is, born after January 1986 (inclusive). Non-Beijing students graduating from master’s degree in 2022 and unemployed graduates leaving school within two years must be born after January 1992 (inclusive); This year’s doctoral graduates and unemployed graduates who have left school within two years must be born after January 1987 (inclusive).

  (five) academic degrees, majors and qualification certificates recognized by the state with the requirements of the recruitment position. Applicants for junior high school teachers should have junior high school and above teacher qualification certificates; Applicants for primary school teachers should have primary school and above teacher qualification certificates.

  (6) Conforming to the relevant provisions of the challenge system.

  Those who have one of the following circumstances are not allowed to apply for the exam: those who have been criminally punished for crimes; Has been expelled from the the Communist Party of China (CPC) Party; Having been expelled from public office or having been dismissed from the employment contract or employment contract by an organ or institution due to violation of discipline and law; Being listed as the object of joint punishment for dishonesty according to law; During the period of punishment or under the influence period; Having been found to have serious violations of discipline such as fraud in the recruitment of civil servants and institutions at all levels; Civil servants and staff of organs (units) managed by reference to the Civil Service Law have been dismissed for less than 5 years; Suspected of violating the law and discipline, being examined, and no conclusion has been reached; After the appointment, it constitutes an avoidance situation as stipulated by relevant laws and regulations; Other circumstances in which employment is prohibited as stipulated by laws, regulations and policies.

  IV. Recruitment Procedures

  Open recruitment includes online registration, qualification examination, comprehensive professional assessment, physical examination and inspection, publicity, employment and other links. Comprehensive professional assessment schedule will be notified separately.

  (1) Online registration. Candidates can register at Gongzhao.com (www.gongzhao.com.cn) from 9:00 am on December 17th, 2021 to 16:30 pm on December 23rd, 2021, and each candidate is limited to one post. At the time of registration, the application materials submitted by the applicants should be true, accurate and complete. If the applicants provide false application materials, once verified, they will be disqualified.

  (2) Qualification examination. All recruitment units shall examine the qualifications of candidates. After the qualification examination, those who have entered the comprehensive professional examination will be notified by SMS or telephone. Those who have not entered the comprehensive professional examination will not be notified. If the number of applicants and the number of planned recruits do not reach the ratio of 3:1, the number of planned recruits will be reduced accordingly until the recruitment plan is cancelled. Qualification examination will run through the whole recruitment process. If applicants are found not to meet the qualification requirements in all aspects of recruitment, their qualification for application or employment may be cancelled.

  (3) Comprehensive professional assessment. Each recruitment unit specifically implements comprehensive professional assessment, and the comprehensive professional assessment implements a percentage system. The minimum qualified score line is 60 points. If the comprehensive professional assessment score is lower than the qualified score line, it is impossible to enter the qualification review. Specific requirements and arrangements such as the time, place and method of comprehensive professional assessment shall be notified separately by the recruiting units.

  (4) Qualification review. According to the order of comprehensive professional assessment results from high to low, enter the qualification review according to the ratio of 1:1. Qualification review includes examination of candidates’ household registration, identity, education, relevant grades, qualifications, qualification certificates and other materials required for applying for positions. In case of failure or failure to participate in the qualification re-examination, it shall be replenished in the order from high to low according to the comprehensive professional assessment results of the post. Where the main information of relevant materials is untrue, which affects the results of qualification review, the Economic Development Zone has the right to cancel the comprehensive professional assessment results of the candidates. The time and place of qualification review shall be notified separately by the recruiting units.

  (5) Physical examination and inspection. Those who pass the qualification review are listed as candidates for physical examination and inspection. Organize them to go to the designated hospital for physical examination, and the physical examination standards shall be implemented with reference to the relevant physical examination standards for civil servants, and those who pass the physical examination shall be listed as candidates for investigation. According to the requirements of recruitment qualifications and job responsibilities, the applicant’s qualifications and moral, ability, diligence, performance and honesty were investigated.

  (6) publicity. Those who pass the physical examination and inspection are determined to be candidates, and they will be publicized in official website Economic Development Zone for 7 working days.

  (7) employment. If there is no objection after publicity, the employment procedures shall be handled in accordance with relevant regulations and the employment contract shall be signed.

  V. Disciplinary requirements

  This open recruitment is carried out in strict accordance with the prescribed requirements and procedures, adhering to the principles of openness, fairness and impartiality, setting up recruitment policies, online application technical consultation telephone numbers, and accepting applicants’ consultation. Staff should strictly implement the confidentiality system and avoidance system, and if there is any violation, it will be dealt with severely in accordance with relevant regulations. Candidates should consciously abide by the relevant regulations, and must not resort to deceit or engage in unorganized activities. Once found, they will be dealt with severely.

  Tel: 010-67832024, 010-67867527.

  Online application technical consultation telephone number: 010-68771309, 010-68771330.

  Tel: Yizhuang New City School of the High School Attached to the National People’s Congress: 010-67857220; Beijing No.2 Middle School Economic Development Zone School: 010-67802277-1101.

  Telephone consultation time: 9:00-12:00 am and 14:00-17:00 pm on weekdays.

  VI. Epidemic Prevention and Control

  During the implementation of open recruitment organization, epidemic prevention measures will be implemented according to the relevant requirements of epidemic prevention and control in COVID-19, and relevant work arrangements will be adjusted appropriately when necessary. Candidates should consciously cooperate to do a good job in epidemic prevention and control. Anyone who conceals or falsely reports the key information of epidemic prevention and control, such as residence history, contact history, health status, etc., and does not cooperate with the staff to carry out epidemic prevention testing, inquiry, investigation, and referral, etc., causing serious consequences, will be disqualified. If there are illegal acts, their legal responsibilities will be investigated according to law.

  Seven, matters needing attention

  1. The recruitment work, do not specify the exam counseling book, do not hold any form of counseling training.

  2. During the recruitment process, relevant information will be published in official website, Economic Development Zone. Recruiters should pay attention to the website information in time and keep the communication tools unblocked. Those who miss important information due to their own reasons will bear their own responsibilities.

The Working Committee of Economic and Technological Development Zone of Beijing Municipal Committee of the Communist Party of China organizes the personnel department.

December 10, 2021

All 43 pharmaceutical companies chose the wrong reference preparation, generic drugs, and they were embarrassed in life and death.

According to "China Business News" reported on July 2nd, 43 azithromycin manufacturers were collectively heartbroken after seeing the catalogue of reference preparations for generic drugs published by the State Food and Drug Administration-they did not find the names of reference preparations backed up before.

The selection of reference preparation is the most critical step in the consistency evaluation of generic drugs. "After the starting gun of consistency evaluation started, the first thing everyone did was to determine and purchase the reference preparation. Once the reference preparation is wrong, it is as if the contestants made a mistake at the end and ran further and further in the wrong direction. " Li Tianquan, co-founder of Yaozhi.com, told CBN.

Since the State Food and Drug Administration announced the catalogue of this batch on April 28th, 43 enterprises have been in a panic. For them, the worst result of betting on the wrong treasure is that they may need to re-purchase the reference preparation and go on the road again, and the price paid is not just a reinvention.

With the mission of paying off debts for history and letting Chinese use drugs with quality and efficacy reaching the original research level, the conformity evaluation of generic drugs has been started in China for almost a year and a half. This time, so many pharmaceutical companies all chose the wrong reference preparation, which made this scene encounter embarrassment.

Collective bet on the wrong treasure.

In March, 2016, the General Office of the State Council issued the Opinions on Evaluating the Consistency of Quality and Efficacy of Generic Drugs (hereinafter referred to as the Opinions). The consistency evaluation of generic drugs started from this document, and the government and enterprises have invested great enthusiasm.

Consistency evaluation determines the life and death of many enterprises’ drugs and the fate of zombie batch numbers. At the same time, the document also gives many temptations: "Drug varieties that have passed the consistency evaluation should be given appropriate support in medical insurance payment, and medical institutions should give priority to procurement and give priority to clinical use. If there are more than three manufacturers of the same variety of drugs that have passed the consistency evaluation, the varieties that have not passed the consistency evaluation will no longer be selected in the centralized procurement of drugs. "

Without consistency evaluation, there is only a dead end, and with consistency evaluation, there is still a living way out. The speed determines the size of the benefits. In the first round of consistency evaluation, 289 varieties in the National Essential Drugs Catalogue (2012 Edition) were included, and azithromycin, as an anti-infection "big drug", was included, which was 0.25 g specification of azithromycin tablets.

At the beginning of consistency evaluation, the state requires enterprises to record their selected reference preparations. If no comments are given within 60 days, everyone can start work according to the registered varieties.. After filing, we spent 10 months doing drug research, prescription process verification test, etc. Now we have entered the drug verification batch to do bioequivalence (BE) test. "Zhang Chenguang, director of the preparation room of Yiling Pharmaceutical Research Institute, told CBN.

In the filing information of reference preparations released by the Central Inspection Institute on April 27, 2016 (as of April 20), there were 43 reference preparations for 0.25 g azithromycin tablets, and everyone chose them without exception.Hisumi(Zithromax,Produced in Pfizer, USA.)。

Within the prescribed 60-day feedback period, no one told me that Histamine could not be used as a reference preparation. 43 companies took this silence as the default, and in order to be the first to reach the finish line, everyone worked against time.

Just before entering the critical moment, the Food and Drug Administration announced the fourth batch of reference preparations, in which it was determined that the reference preparation of azithromycin of this specification was not Histamine previously filed by pharmaceutical companies, butTevaPharm B.V, Israel"Azitromycin 250 TEVA", listed in the European Union, originated in Croatia. This news is equivalent to announcing that all 43 pharmaceutical companies have got the reference preparation wrong.

"All manufacturers have chosen the wrong reference preparation for azithromycin tablets? This problem is a bit big, but why is there such a big deviation? " Zhang Chenguang is not the only one who is puzzled.

Click to view larger image.

Is it reasonable to use TevaPharm B.V’ s products as reference preparations? Zhang Chenguang combed the development history of azithromycin. In the 1970s, a new macrolide antibiotic named azithromycin was discovered in Pliva, the former Yugoslavia. In 1981, Pliva Company applied for the patent of azithromycin in Yugoslavia, and then applied for the patent all over the world (including the United States).

At that time, Pfizer, USA, realized the potential of azithromycin and took the initiative to contact Pliva Company to obtain the authorization of azithromycin. In 1986, the two companies reached an agreement, and the agreement period expired in 2006. According to the agreement,Pfizer has obtained the global distribution rights of azithromycin, while Pliva Company has retained the distribution rights in Central and Eastern Europe..

Subsequently, Pliva Company listed in Central and Eastern European countries with Sumamed as the trade name of azithromycin; Pfizer is listed in other countries outside Central and Eastern Europe under the trade name of Histamine.

"When Pfizer first listed azithromycin in the United States, it only had capsule dosage form, and the tablet of 0.25 g specification was approved by FDA (US Food and Drug Administration) in 1996; Pliva company has not listed azithromycin tablets with the specification of 0.25g, only with the specifications of 0.125g and 0.5g..In contrast, Pfizer’s products are more suitable. However, the varieties were determined without public discussion, which made azithromycin manufacturers all over the country’ win the trick’. Should the reasons for choosing reference preparations be announced? Or solve the problem at the beginning, it won’t lead to rework."A medical expert said.

Anyway, this time, azithromycin manufacturers made a collective bet wrong.

A Dreamer on the Amazon River —— The Second Series Report on the Implementation of Ecuadorian Sinclair Project by China Power Construction Company.

Local employees at work

Local employees at work

  Cctv news After six years’ struggle, the construction of Sinclair Hydropower Station in 2016 has entered a fruitful harvest season.

  At the celebration ceremony of the first batch of units put into operation, Vice President Grasse of the Ecuadorian government said that the cooperation between the Chinese and Ecuadorian people can achieve great things.

  China’s ambassador to Ecuador, Wang Yulin, said that Sinclair Power Station has played an exemplary role and written a new chapter in China-Ecuador cooperation.

  Yes, with sincere cooperation between China and Ecuador, the virgin forests that have been sleeping for thousands of years along the Amazon River and the Andes that have been silent for thousands of years have been awakened, and majestic dams, wide factories and towering iron towers stand tall. The singing of hydraulic turbines replaced the noise of the river, and all the silver wires delivered powerful electricity to the Ecuadorian people … …

  While benefiting the local people and realizing the dream of one-third of the local population to use electricity, China Power Construction has also built its own dream of "going out" and creating a new pattern of international operation, which has played an exemplary role and written a new chapter in Sino-Ecuadorian cooperation.

  A piece of white paper is easy to write.

Master China and Ecuadorian apprentice

                                                       Master China and Ecuadorian apprentice

  On July 28th, 2010, Sinclair Hydropower Station (hereinafter referred to as CCS) started construction. Under the leadership of several project leaders over 35 years old, a group of "dolls" under the age of 27 and 28 started the construction of China’s largest hydropower station overseas at that time and China Power Construction Company’s first project to enter the middle and high-end market in South America. This is a "zero international" experience project execution team without any international construction experience. As the saying goes, "a piece of white paper is easy to write".

  Hong Kun, director of CCS project and then secretary of the Party Committee of the 14th Bureau, said: "It was really a mixture of excitement and pressure, excitement and anxiety."

  The "first word" written by the young team is a Project Management System Document covering the whole process from design to construction, production to management, front line to logistics, based on a comprehensive investigation and evaluation of local politics, law, taxation, labor, equipment, materials and logistics, so as to strengthen the scientific, systematic and risk controllability of project management and control.

  They set up a biweekly "high-level meeting" composed of the Chinese side, the owner and the consultant, which strengthened the consultation and communication ability of the three high-level parties. Although there was a 12-hour meeting, disputes and debates continued, but a consensus was reached and major issues affecting the smooth implementation of the project were solved in time.

  They also set up the Joint Dispute Committee (CDB), chaired by Bernan, a famous Spanish lawyer, with Karl, a German engineer, and Albordt, a Colombian engineer as members, as a neutral third party to intervene in the implementation of CCS project, so as to avoid time-consuming and costly international arbitration and litigation, solve disputes fairly and reasonably, and better balance the interests of the parties to the contract. This meeting has been held nine times so far, and 13 disputes have been successfully resolved, with a claim amount of hundreds of millions of dollars and a construction period of 24 days.

  The c of EPC general contract refers to the project construction. The main construction of ccs project mainly includes four parts: the first hub, the water conveyance tunnel, the regulating reservoir and the underground powerhouse. The implementation period is long, the span is large, and there are many difficulties. "Cost control is particularly important." Zhang Degao, the chief economist of the project, said: "We systematically analyze and calculate the total cost of the project once a year, and six versions have been formed so far."

  Analyze and calculate the total cost of the project on a regular rolling basis, deeply analyze the composition and changes of various expenses, and find out the changes and causes of the expected profits, so as to study and formulate targeted control measures, which can control the project cost as a whole, reduce contract risks, continuously improve the management level of overseas projects and ensure the overall operating results of the project.

  In their view, "progress is the biggest cost". Wang Fengjun, the business assistant, said: "We often go deep into four construction departments, and work with the construction manager to carefully analyze the cost input of people, materials and machines, determine the key links and key processes that affect the cost, rectify the deviation in time, and check on a monthly basis to ensure the smooth completion of major node goals." 

  During the difficult excavation of a water conveyance tunnel with a total length of 24.8 kilometers and a maximum excavation diameter of 9.15 meters, they conducted 11-stage tool consumption and 14-stage over-footage assessment on the construction of TBM1, which effectively promoted the TBM1 to achieve a good result of an average monthly footage of 663 meters and a maximum monthly footage of 1,059 meters. The incentive assessment of TBM1 segment production was quantified to each segment and each ring, which also achieved good results. The production task of TBM1 segment was successfully completed ahead of schedule on February 22, 2014.

  In the ccs project department, there is a story that a management department directly organizes and directs the construction. In February 2012, the power station construction was in full swing, and a large number of construction and management personnel entered the site. However, the construction of the living camp was seriously delayed due to the slow construction of local subcontractors, especially the No.2 main site as the project office and production command center. As a result, the owner has serious doubts about the construction management ability of the project department.

  In order to reverse the passive situation, the project was always ordered by Zhang Degao to be the production commander of the construction of Camp No.2 during the day and handle the complicated affairs of contract business at night. To build a good camp according to the high standards of first-class large multinational companies, the time was tight and the task was heavy. He led a deputy director of the business department to decompose and refine the construction schedule of the camp, and reversed the construction period, so that the construction task of Camp 2 was completed on schedule in a swamp. Although Zhang Degao’s face has become a "belt face" — — When the safety helmet is taken off, a circle of white hat belt marks are conspicuously left on the tanned face, but the good construction organization and management ability have completely changed the previous bad impression of the owner.

  Facing the uniform, beautiful environment and supporting facilities of Camp 2, the owner’s general manager praised: "I like every grass and tree in the camp".

  You shouldn’t be a sinner if you are bitter and tired

Zhou Xiancai and his fiancee Lorena

Zhou Xiancai and his fiancee Lorena

  In the interview with ccs project department, I also heard a new thing. The project department set up a design and research institute. Including more than 20 external local engineers, the number of design and research institutes reached more than 100 at the peak, and the current director is He Guoxiong, 28.

  The e of EPC general contracting refers to engineering design. The design of CCS project is mainly divided into conceptual design, basic design and detailed design, and the design documents of each stage need to be strictly approved by the owner. The design scope includes the main works such as the head hub, water conveyance tunnel, water storage reservoir, water diversion and power generation system, and ancillary works such as permanent operation village, power transmission and transformation lines and aerial ropeway. If the main workload is calculated by the number of drawings, calculations and reports in the detailed design stage, the total amount is about 9000.

  Design work is the leader of the whole project construction, which plays a vital leading role in the progress, quality and success of the project construction. The design management burden of coordinating all parties involved in the design of CCS power station, introducing and controlling well-known design and consulting institutions at home and abroad is on the shoulders of young He Guoxiong.                                                                                                                                      
  "Language barrier is the biggest difficulty," He Guoxiong said. "The contract language is Spanish, and we are very short of Spanish translation familiar with hydropower projects, which makes it a great challenge to prepare western design documents. Every time we complete a document, we have to go through Chinese — — English — — In the conversion process of western languages, the owner’s letters have to go through the same conversion. "

  Faced with language difficulties, standardization difficulties and conceptual differences, the design institute adopted a new design management model, introduced "outside brain" and local engineers to promote "design after design", and completed the review and approval of the project conceptual design in only one year; It took 13 months to complete 12 volumes of basic design reports, and completed about 12,080 design criteria, calculations, reports and drawings in the detailed design stage, with the highest monthly completion rate of 500 and the highest monthly approval rate of 400. By the end of 2015, all the designs of the main project have been completed.

  P of EPC general contracting refers to the procurement of engineering equipment. The procurement chain of permanent mechanical and electrical equipment for CCS project is long, from mechanical and electrical conceptual design, procurement bidding, factory supervision and factory acceptance, to land and sea transportation, on-site acceptance, installation inspection, commissioning and operation, and so on. Many equipment and materials are gathered in the construction site from famous manufacturers in China and the world, and they have to go through 11 major procurement processes and 6 major installation processes, and there are countless small round-trip processes.

  On April 11th, 2013, Feng Yanguo, the representative of China Power Construction International Company and the electromechanical manager of the project department, came to Paris to accept the 500 kV high-voltage cable. Hardly had he got off the plane when he received the news of his mother’s death. After a week of acceptance with tears in his eyes, he came home, holding his mother’s urn, unable to cry … …

  When transporting an auxiliary transformer with a length of 4.1 meters, a width of 3.2 meters and a height of 5.6 meters, I met a bridge opening with a height of less than 5 meters on the way, and the equipment could not pass. Liu Helin, an electromechanical assistant, and Zhao Lei, a young man who just left the school in 2011, ran before and after a while in a rainstorm and a while in the sun, but they just came up with a strange trick of "changing big tires for small tires", which reduced the height of the truck and successfully passed through bridge opening. Every day, I start at six o’clock in the morning and stop at five o’clock in the afternoon. Sometimes I drive only 30 kilometers in one day. From the port city of Guayaquil to the construction site, they ate and lived with local drivers and followed the car for eleven days, with a journey of 710 kilometers.

  According to statistics, there are 188 procurement contracts for permanent mechanical and electrical equipment and materials of CCS project, including 54 main contracts, 96 supplementary contracts and 23 contracts in the form of construction materials. The main signatories are 33 Chinese-funded enterprises, 5 Sino-foreign joint ventures and 3 foreign-funded enterprises in Japan, France and Norway, with a purchase contract value of more than 540 million US dollars.

  "If there is a problem with the permanent mechanical and electrical equipment and it can’t send electricity, then all the efforts made by thousands of people for the construction of power stations will be wasted. We would rather be bitter and tired than be sinners, "Liu Helin said.

  Thanks to China Hydropower.

Bibiana and Dr. China who rescued her

                                                      Bibiana and Dr. China who rescued her

  Bibiana, 25, was a waitress in a small restaurant in St. Louis village near Camp 2 of CCS Power Station. On the evening of May 29th, 2012, she suddenly had a stomachache and wanted to have a baby. After receiving the news of asking for help, CCS Project Department immediately dispatched a doctor, nurse and an ambulance from Camp 2, and sent her to Chaco City Hospital more than 30 kilometers away in time to ensure the safety of mother and child. When mentioning this matter, Bibiana always said excitedly: "Thanks to the selfless help of China Hydropower!" Today, she and her sister are both secretaries in the project administration department, and her brother-in-law is a driver.

  There are many bends and steep slopes along the CCS site, where there is no rain every day, frequent landslides and rollover accidents. One day at 6 o’clock in the afternoon, Ma Guihong, manager of the plant construction department, received a phone call from Wang Jinlong, a safety assistant: "A local bus from Lago to Quito had a rollover accident near the volcanic town, and two passengers were still under it. Please send a 16-ton crane to participate in the rescue immediately! "

  The accident site is 33 kilometers away from the construction department of the factory building. The highway grade is low, the dark road is narrow and curved, the crane tonnage is heavy and the body is long, but time is life. The construction department can’t take care of these things, so it immediately sends a crane, a pickup truck and six employees to the scene … … When the rescuers sent the wounded to the ambulance and returned to the station, it was already more than 12 o’clock in the middle of the night.

  According to the data, in 2015 alone, the hospital of CCS Project Department provided 33,867 person-times of diagnosis and treatment services for local people, carried out 12 social emergency medical rescues, and treated and referred 39 injured people.

  Give a rose, but leave a fragrance in your hand. In recent years, CCS Project Department has invested more than 500,000 US dollars to help local people and give back to local society. They actively improved roads, repaired gardens, installed drinking water pipes, built school guardrails and presented school supplies for Chaco City, where the project is located, and established the hydropower image of China with a good reputation. The project general manager Zi Jiquan won the title of "Honorary Citizen of Chaco City" for many times.

  At the construction site, we also interviewed Zhou Xiancai, an interpreter from the construction department of Shangpingdong. Xiao Zhou, a 28-year-old graduate of Xi ‘an International Studies University, has been in constant contact with the local secretary Lorena employed by the office for more than three years, and has developed a feeling of admiration. Lorena said in blunt Chinese: "China young man, hard-working, handsome!" Earlier this year, Lorena followed Xiao Zhou back to her hometown in Ankang, Shaanxi Province for the Spring Festival, and visited Xi ‘an and Chengdu. She is very appreciative of the sense of responsibility of China’s young man and the family’s reunion, and she is very interested in China’s bell tower, Wild Goose Pagoda, Wu Hou Bar and other ancient buildings. She said: "In the future, I will follow wherever I am thoughtful."

  China element and China hydropower have changed the local social outlook and people’s life, and had a great impact on the development of Ecuador.

  The investment in CCS project is huge, which has brought more than 7,000 direct jobs and 15,000 indirect jobs to the local area. 80% of the employees in the project department are local laborers, including senior managers such as deputy director of technology and manager of human resources department. There are only 10 Chinese employees in the SHSA (Safety, Health, Hygiene and Environment) Management Department, but there are more than 100 local employees.

  While creating many employment opportunities, the project department has sent high-level skilled technicians to strengthen the training of local employees, and even simple tasks such as binding steel bars are "hands-on". Over the past few years, the project department has held more than 600 multi-level trainings on construction operation, quality and safety and labor management for local employees, with the number of trainees reaching 13,000, and trained more than 1,000 construction team leaders and more than 400 construction technical talents and management talents at all levels, which won high recognition from the local government and people and effectively ensured the smooth progress of the project construction.

  Embracing the local society with open arms and actively promoting the "localization" of project implementation have become the new normal for China Power Construction to develop overseas business. (Ran Luchao Yu Yong)